Heritage meets modern sustainability at The Harrison
Leslie Clark is proud to announce the practical completion of The Harrison, 134–146 Curtain Road, London EC2 – a landmark project delivered for Aviva Investors. Acting as Project Managers and CDM Principal Designers, we oversaw the extensive refurbishment of seven buildings, five of which were listed, originally constructed between 1881 and 1930, now transformed into c.40,000 sq. ft of contemporary office space.
Blending past and present
This redevelopment carefully balanced heritage restoration with forward-looking design. The works included substantial façade repairs, the restoration and reconfiguration of internal spaces, and the introduction of mezzanine floors, new lifts and modern end-of-journey facilities. Sustainability was at the heart of every decision – from the installation of a 41kW photovoltaic array and rainwater harvesting system, to achieving an EPC A rating and on track to achieve BREEAM Excellent.
Delivering with precision in a complex setting
The project presented a range of unique challenges, including:
- Maintaining the operation of The Blues Kitchen – Shoreditch’s largest live music venue – throughout the works
- Managing access and logistics on a TfL Red Route
- Coordinating 18 Party Wall Awards
- Safeguarding the stability of seven interconnected listed structures
Despite these complexities, practical completion was achieved without a single reportable accident. A testament to meticulous planning, collaboration and rigorous safety management.
Preserving character, enhancing performance
The result is a collection of conjoined, light-filled workspaces that retain the texture and character of the original buildings while meeting modern compliance and sustainability standards. Extensive external terraces, upgraded cores, and high-quality amenities support a contemporary tenant experience without compromising the architectural heritage that defines the site.
Project Details
Client: Aviva Investors
Area: c.40,000 sq. ft
Roles: Project Management, CDM Principal Designer
Key achievements
- EPC A and BREEAM Excellent (target)
- Retention of original glazing and timber floors
- Completion of TfL s.278 works
- Full restoration and refurbishment of all seven buildings, including five listed structures
- No reportable accidents or incidents